Took a new scuba tank to the dive shop and I wasn't expecting such drama about the act
Dude said he needed to visually inspect the tank before filling. I told him I wasn't using it for life support/diving just filling an airgun. Then dude went on about how that didn't matter, it's something that needed to be done according to DOT rules and regs for transporting the bottle in my truck after I left...He went on about other government rules and laws, and regs and I kinda just glossed over and replied, "Well, you would know what's required!"
I was told initially it would be ready end of the day. It was 9am at this point and would require another 30mile trip. I said, "It's the middle of Illinois in December, didn't know there would be such of backlog of tanks being filled?" Then dude says it would be 20 minutes. (What a yo-yo)
When it was done, the charge was $25 and only 2700psi because dude said it would need to sit and cool to top it off to 3000. I don't know anything about that, but I wouldn't think another 300psi would matter. Anyhoo. I believe I'll be getting the VEVOR $170 amazon 4500psi compressor...too much nonsense, time, fuel cost to mess with the SCUBA tank and then I have to hand pump the 500psi to full 3000psi anyway.
Thoughts?
Dude said he needed to visually inspect the tank before filling. I told him I wasn't using it for life support/diving just filling an airgun. Then dude went on about how that didn't matter, it's something that needed to be done according to DOT rules and regs for transporting the bottle in my truck after I left...He went on about other government rules and laws, and regs and I kinda just glossed over and replied, "Well, you would know what's required!"
I was told initially it would be ready end of the day. It was 9am at this point and would require another 30mile trip. I said, "It's the middle of Illinois in December, didn't know there would be such of backlog of tanks being filled?" Then dude says it would be 20 minutes. (What a yo-yo)
When it was done, the charge was $25 and only 2700psi because dude said it would need to sit and cool to top it off to 3000. I don't know anything about that, but I wouldn't think another 300psi would matter. Anyhoo. I believe I'll be getting the VEVOR $170 amazon 4500psi compressor...too much nonsense, time, fuel cost to mess with the SCUBA tank and then I have to hand pump the 500psi to full 3000psi anyway.
Thoughts?
Last edited: